Adding Components to Cans

Posted by robolo , 08 May 2010 · 556 views

This week the house passed electrical inspection as well as plumbing and framing. Drywall starts next week. In the meantime I've started adding components to the cans in the mechanical room:

Posted Image

Here is the bottom of the first can that now has the Netgear 24 port switch and Leviton Phone distribution hubs. The extra shelf will hold the Cable Modem:
Posted Image

The bottom of the the second can has the 3 zone expansion modules for the ELK and coax distribution components:
Posted Image

The third can now houses the ELK M1 and in the lower half the Data Hub Module, and 2 M1XSP (one for UPB and one for HVAC)
Posted Image
Posted Image