20150219 18. CAN3 Needs final positioning door And trim
J

20150219 18. CAN3 Needs final positioning door And trim

Pulling out the cabling reveals the can still needs to be adjusted, screwed in place, door and trim to neaten it up. I need to get battery, power supply, three XINs, one XOVR, a DBH and a run off to a keypad. I think if space is a premium the DBH wont make it in this one. We'll have to wait and see. Thankfully much of this cabling cab be pushed back in the wall cavity to provide some extra service length and only a few runs that are spare will need to be coiled in the can!
There are no comments to display.

Media information

Album
Jozza House
Added by
Jozza
Date added
View count
960
Comment count
0
Rating
0.00 star(s) 0 ratings

Share this media

Back
Top