Here are some pictures as the Low Voltage (LV) wiring will probably start in about 4 weeks. It's 11,000 ft home with a courtyard in the middle, which makes it challenging. Since do this is SO overwhelming, I am doing step at a time.
So far:
Centralized wiring with Clipsal
11 miles of cable (hopefully, it will be enough
)
Contacts, Motion sensors, IR terminating on 20 66 blocks in two 50" canister.
Camera Power, power shades, door stricks terminating into European terminal strips in a 50" canister.
Network, telephone terminating into 110 blocks in a 19" rack
CCTV cameras terminating into modulator
A/V RG6QS, RG59, cat 6 terminating into the rack (balums?)
Speaker wire terminating into the rack (audio distribution?)
Aprilaire thermostats
Will wire for a couple of touchscreens and UMPC
Wow, this all really make you feel mortal!
Probably will do CQC
Anyway, please enjoy the pictures
So far:
Centralized wiring with Clipsal
11 miles of cable (hopefully, it will be enough
Contacts, Motion sensors, IR terminating on 20 66 blocks in two 50" canister.
Camera Power, power shades, door stricks terminating into European terminal strips in a 50" canister.
Network, telephone terminating into 110 blocks in a 19" rack
CCTV cameras terminating into modulator
A/V RG6QS, RG59, cat 6 terminating into the rack (balums?)
Speaker wire terminating into the rack (audio distribution?)
Aprilaire thermostats
Will wire for a couple of touchscreens and UMPC
Wow, this all really make you feel mortal!
Probably will do CQC
Anyway, please enjoy the pictures