hucker
Active Member
We are planning to move into our new house next week. Electrical final is today/tomorrow and we wanted to add a couple of exterior spots. With UPB (or any of the other PLC systems, zwave, x10, insteon) all we needed to do was get to power with a switch placed anywhere convenient. We were able to easily add the UPB switches in a storage room and reprogram the switches by the entries to make it all work. The cost of this is a fraction of running wires directly to the switch used for control. Sheetrock, paint, lots of wire.... yuck!
For me, the flexibility of reconfiguring and adding is really the deal maker for UPB and it's ilk.