Finished results.  I still have the Ethernet cabling to finish, but all of the zones (three unused left) have been wired, configured and tested.  I was going to do cut length wiring and lace it in, but my feet were killing me standing on the ladder.  I had to solder the resistors on, shrink wrap them, label them, etc.  Some cables were labeled when they installed them but I ended up wit six cables with no labeling on them.
 
The panel is far cleaner than when I started though.