The basement is (mostly framed), so now it's time to install the panels. I have two 42" panels
I'm not sure the ELK box is large enough. I could swap the Leviton and ELK panel contents, but I don't know if the ELK components will line up with the holes. I do have a 14" ELK (SWB-14), but I wasn't planning to install it. The three panels are going to be installed into the walls of a 3-foot square alcove, one in each side. I was planning to put the ELK panel in the middle. Each of the 42" will have two 15A j-box duplex outlets, and ELK will have one 15A j-box duplex outlet. The plan is to line the tops of the panels up, but at what height? I plan to run conduit from the middle of the ELK panel to each of the 42" panels, as well as directly between each of the 42" panels, at about 7" from their bottom.
Can you critique this plan, and offer advice for improving it?
Chris D.
- Leviton SMC-420: containing telephone, network (about 1/3 full)
- OnQ EN4280: containing audio, video, CCTV, intercom (4/5 full)
- ELK SWB-28: M1G, 3*M1XIN, M1RB, M1OVR, M1TWA, M1XEP, 3*M1XSP (overfull?)
I'm not sure the ELK box is large enough. I could swap the Leviton and ELK panel contents, but I don't know if the ELK components will line up with the holes. I do have a 14" ELK (SWB-14), but I wasn't planning to install it. The three panels are going to be installed into the walls of a 3-foot square alcove, one in each side. I was planning to put the ELK panel in the middle. Each of the 42" will have two 15A j-box duplex outlets, and ELK will have one 15A j-box duplex outlet. The plan is to line the tops of the panels up, but at what height? I plan to run conduit from the middle of the ELK panel to each of the 42" panels, as well as directly between each of the 42" panels, at about 7" from their bottom.
Can you critique this plan, and offer advice for improving it?