Hi,
after some days working well during the night my old BRE WC has changed IP address (due to a DCHP setting) and the other PLC WC has stuck sending WEBSET to this reconfigured BRE WC. I implemented code stopping to contact the failed BRE WC, but once the WEBSET to the not addressable WC is in the queue, using WEBSET on the PLC WC for data logging on the server is impossible...
If this situation is verifiable, I need a purge communication stack command....reset is no solution unless the logging happens first...
I also noticed an open FTP port with the BRE WC.
thanks
after some days working well during the night my old BRE WC has changed IP address (due to a DCHP setting) and the other PLC WC has stuck sending WEBSET to this reconfigured BRE WC. I implemented code stopping to contact the failed BRE WC, but once the WEBSET to the not addressable WC is in the queue, using WEBSET on the PLC WC for data logging on the server is impossible...
If this situation is verifiable, I need a purge communication stack command....reset is no solution unless the logging happens first...
I also noticed an open FTP port with the BRE WC.
thanks