Hello All,
Does anyone have a suggestion or opinion for the best approach for installing an Elk M1 system? For example, should I install and wire every component before powering up or is it best to install some key components, i.e. the Elk and a keypad first? Any guidance on this would be greatly appreciated. I've provided a list of components I will be installing for reference.
Thank you,
Elk M1
Ethernet Module, M1XEP (1)
Aux Power supply (1)
Honeywell Wireless, M1XRF2H (1) and sensors
Output Expander, M1XOVR (1)
Relay Board, M1RB (1)
Keypads, M1KPB (2), M1KPAS (1)
Data Bus Hubs, M1DBH (2)
Speakers, SP12F (4)
Zwave, M1XSLZW w/ VRC0P+3 (1)
UPB Interface, M1PCSPIM (1)
Serial Port Expander, M1XSP (1)
Uplink 4500ez (1)
Door Bell Detector Elk-9301
Does anyone have a suggestion or opinion for the best approach for installing an Elk M1 system? For example, should I install and wire every component before powering up or is it best to install some key components, i.e. the Elk and a keypad first? Any guidance on this would be greatly appreciated. I've provided a list of components I will be installing for reference.
Thank you,
Elk M1
Ethernet Module, M1XEP (1)
Aux Power supply (1)
Honeywell Wireless, M1XRF2H (1) and sensors
Output Expander, M1XOVR (1)
Relay Board, M1RB (1)
Keypads, M1KPB (2), M1KPAS (1)
Data Bus Hubs, M1DBH (2)
Speakers, SP12F (4)
Zwave, M1XSLZW w/ VRC0P+3 (1)
UPB Interface, M1PCSPIM (1)
Serial Port Expander, M1XSP (1)
Uplink 4500ez (1)
Door Bell Detector Elk-9301