ccmichaelson
Active Member
At each keypad location I ran CAT6 + Speaker cable into a double gang LV box from Carlon. The ELK-SP12F came with a wall mount plate (no screws just "glued" on I think. In order to attach the speaker to the M1-KP2 keypad do I just pry the wall plate from the speaker?
Also, how would I put the KP2 into the flush mount kit (M1BBK2)? Would I need to remove my double gang LV box and cut into the sheetrock?
Also, how would I put the KP2 into the flush mount kit (M1BBK2)? Would I need to remove my double gang LV box and cut into the sheetrock?