HAI LIGHTING TIPS

I am about to jump into the lighting control programing of a house using all HAI dimmers,scene, status and aux switches. (about 80) Any tips out there? Any ways/ideas of saving time, organizing, and working my project. Shoot out any tips you may have
 
Are the switches already installed and running, or are you GOING to install them? Are you going to use HAI's method of control with HAI switches, or the UpStart method of programming with any UPB switches? Are you programming the HAI using PC Access, or using another add-on product like CQC or HomeSeer?
 
Are the switches already installed and running, or are you GOING to install them? Are you going to use HAI's method of control with HAI switches, or the UpStart method of programming with any UPB switches? Are you programming the HAI using PC Access, or using another add-on product like CQC or HomeSeer?

The switches are already installed, I usually use pc access and upstart. I am open to any cooler or more organized suggestions???
Any tips?
 
Back
Top