They say a picture is worth a thousand words... here's a few thousand:
The basement layout; there has been a few modifications since I drafted this:
The initial install of the Elk M1; move of the networking equipment:
My door contact install with EOLR inline; I assume that it's done correctly?
Cheers,
Kaoru
The basement layout; there has been a few modifications since I drafted this:
The initial install of the Elk M1; move of the networking equipment:
My door contact install with EOLR inline; I assume that it's done correctly?
Cheers,
Kaoru