Hi Guys,
I started a similar post in the Elk forum. I don't mean to double post but I've started looking at some of the Altronix modules as well and thought the post would be more appropriate here.
I'm trying to understand when and why you would use power distribution models. I just bought my ELK system with the following.
Elk M1GKS
2 - KP2
2 - M1XIN
1 - M1XOVR
1 - M1EXP
1 - M1DBH
1 - Elk-Wk1
1 - ELK-45
3 - Peizo sirens
1 - ELK-SP35
4 - ELK-SP12F
8 - Blue Line PIR
3 - 5825A Glass break sensor
It was recommended that I run the 8 PIR's on separate power from the M1. I then did some more reading and saw recommendations of running all of the expansion modules also on separate power from the elk. However, I also see posts of setups with about the same equipment as my setup with no power distribution modules.
Can you guys clarify when to use power distribution modules? What is good practice? Also, are they always on or is there a trigger from the M1 to turn them on? From my above setup, I would need 1 PD9 if I wanted to just put the motions on separate power. Is there any benefit to sticking with the ELK PD9 over the Altronix units?
It was also recommended that I get an additional battery. If I but another battery with charger, how do I wire this in? Should the second one power just the PD9?
Are there power distribution modules that handle 12v and 24v? The reason I ask is I have also purchased a 24v power supply that I will be using with the M1XOVR for sprinkler, irrigation control (5 zone).
Thanks,
Peter
I started a similar post in the Elk forum. I don't mean to double post but I've started looking at some of the Altronix modules as well and thought the post would be more appropriate here.
I'm trying to understand when and why you would use power distribution models. I just bought my ELK system with the following.
Elk M1GKS
2 - KP2
2 - M1XIN
1 - M1XOVR
1 - M1EXP
1 - M1DBH
1 - Elk-Wk1
1 - ELK-45
3 - Peizo sirens
1 - ELK-SP35
4 - ELK-SP12F
8 - Blue Line PIR
3 - 5825A Glass break sensor
It was recommended that I run the 8 PIR's on separate power from the M1. I then did some more reading and saw recommendations of running all of the expansion modules also on separate power from the elk. However, I also see posts of setups with about the same equipment as my setup with no power distribution modules.
Can you guys clarify when to use power distribution modules? What is good practice? Also, are they always on or is there a trigger from the M1 to turn them on? From my above setup, I would need 1 PD9 if I wanted to just put the motions on separate power. Is there any benefit to sticking with the ELK PD9 over the Altronix units?
It was also recommended that I get an additional battery. If I but another battery with charger, how do I wire this in? Should the second one power just the PD9?
Are there power distribution modules that handle 12v and 24v? The reason I ask is I have also purchased a 24v power supply that I will be using with the M1XOVR for sprinkler, irrigation control (5 zone).
Thanks,