CalypsoCowboy
Member
I purchased a DIY video from the Training Dept which was pretty helpful with a lot of techniques but didn't address one situation I have.
I have a split level house, two levels on one side one on the other. This installation is for the side with one level. The rooms have raised ceilings so I don't really have any type of an attic on the one side. Maybe 1 or 2 foot at most so I'm planning on running all the wiring under the house as I have a crawlspace. The problem I'm finding is the walls were put on the flooring material which was installed on a sill plate sitting on the concrete fountation so I only have a little room betwen the flooring and concrete. I think I can get and drill down fine, my concern is I need to come very close to the end of the 2x4 when I drill down in hopes that I get the end of the bottom 2x4. I've marked in green where I think I need to drill.
Is this what I need to do or are there other tricks I can use to get an upper and lower hole to line up.
-Josh
I have a split level house, two levels on one side one on the other. This installation is for the side with one level. The rooms have raised ceilings so I don't really have any type of an attic on the one side. Maybe 1 or 2 foot at most so I'm planning on running all the wiring under the house as I have a crawlspace. The problem I'm finding is the walls were put on the flooring material which was installed on a sill plate sitting on the concrete fountation so I only have a little room betwen the flooring and concrete. I think I can get and drill down fine, my concern is I need to come very close to the end of the 2x4 when I drill down in hopes that I get the end of the bottom 2x4. I've marked in green where I think I need to drill.
Is this what I need to do or are there other tricks I can use to get an upper and lower hole to line up.
-Josh