[Blogs] Three Roberts - UPB floor plans

Status
Not open for further replies.

CT Droid

CT Bot
Here are the UPB floor plans for the 1st and second floors. The third floor is pretty much all traditional switches. These were the plans the electrician is using to run his line voltage power. Almost all the lighting and 1/2 hot receptacles are home run wired back to the mechanical room where the load UPB switches will be located in 3 PCS switch cabinets. Originally there were only 2 switch cabinets but changes in the electrical plans now require a third to hold the 54 UPB switches - each cabinet will hold a maximum of 20 switches. The electrician added an upcharge to cover the extra romex needed to homerun everything back to the mechanical room! The majority of switching will be accomplished through 6 button PCS scene controllers on the walls. These will be in place of what would otherwise be 4, 5, or even 6 gang switch boxes.


This thread is not open. If you wish to respond, please respond using the original blog entry link. View the original blog entry
 
Status
Not open for further replies.
Back
Top