With the architects plans I used Visio to create wiring plans for each of the three floors. Each termination point is identified by type of outlet or sensor which determines the type of wire that is needed. By using the scale drwings I was able to determine the length of each wiring run and then the cumulative amount of wire needed for each wire type. Also could identify number of each sensor needed, the voltage drain on the Elk by all the powered sensors, and the number of wire terminations needed at the mechanical room. Here is the first floor which includes the new mechanical room.
Here is the second floor:
And the third floor: