IVB
Senior Member
I've now run ~7runs of sensor wire, 4 runs of speaker wire. I'm finding that it takes me about 1hr to do the actual run, anywhere from 1-2 hours to hook up to the Elk (or amp) and mount the device [ie sensor, speaker, etc]. This isn't just a strip&plug in, but rather screw it in such that it looks clean. This is only me, so I have to go back and forth from attic->room->crawlspace, back to attic, etc.
That's 2-3 hours/item. I can see keeping this to 2 once I get better at it, but I don't see how I could move faster doing it myself.
Is this what others are finding?
I ask b/c I've got another 30 sensors and 12 speakers to install, plus i'm moving some equipment around. I didn't realize just the install would take >100 manhours. Alas, I wish I could find a cheap way to hire assistance that i'd trust.
That's 2-3 hours/item. I can see keeping this to 2 once I get better at it, but I don't see how I could move faster doing it myself.
Is this what others are finding?
I ask b/c I've got another 30 sensors and 12 speakers to install, plus i'm moving some equipment around. I didn't realize just the install would take >100 manhours. Alas, I wish I could find a cheap way to hire assistance that i'd trust.