Hi all,
I have a large reach system - several hundred feet out to some out buildings. I want to add additional power along the daisy chain for the furthest devices.
I have a P112K that I've put on the line right beside an M1XRFEG. I'm assuming that I would remove red and black (power) from the M1XRFEG that originates at the M1 and replace it with the power supply from the P112K. Injecting 12V into the system from a second system seems wrong to me but I can find no documentation.
Does anyone know the answer to this? Should I completely separate them? Separate the grounds? Separate the +12?
Thanks!
I have a large reach system - several hundred feet out to some out buildings. I want to add additional power along the daisy chain for the furthest devices.
I have a P112K that I've put on the line right beside an M1XRFEG. I'm assuming that I would remove red and black (power) from the M1XRFEG that originates at the M1 and replace it with the power supply from the P112K. Injecting 12V into the system from a second system seems wrong to me but I can find no documentation.
Does anyone know the answer to this? Should I completely separate them? Separate the grounds? Separate the +12?
Thanks!