RandyKnight
Active Member
We got the foam insulation sprayed today and drywall should drop tomorrow. They start hanging it on Thursday.
So I now have to say I am "done" with my pre-wire. I finally had to just call for the foam and drywall to go in because I kept coming up with new stuff to pull.
The final score:
-22 boxes (1000' each) of Cat5e
-5 spools (500' each) of RG6
-4 spools (250' each) of 14/2 speaker wire
-Miscellaneous pulls of shielded 22/4 for IR, 14/2 for touchscreen power, etc.
-Somehwere in the neighborhood of a million holes drilled ... it seems that way anyway
-At least 10 lbs. of sawdust inhaled, swallowed, etc.
Can I say I'm really tired?
Now to get some rest before I have to trim it all out. :lol:
Photos at http://sixknights.blogspot.com
So I now have to say I am "done" with my pre-wire. I finally had to just call for the foam and drywall to go in because I kept coming up with new stuff to pull.
The final score:
-22 boxes (1000' each) of Cat5e
-5 spools (500' each) of RG6
-4 spools (250' each) of 14/2 speaker wire
-Miscellaneous pulls of shielded 22/4 for IR, 14/2 for touchscreen power, etc.
-Somehwere in the neighborhood of a million holes drilled ... it seems that way anyway
-At least 10 lbs. of sawdust inhaled, swallowed, etc.
Can I say I'm really tired?
Now to get some rest before I have to trim it all out. :lol:
Photos at http://sixknights.blogspot.com