Ok not really panic. I am 2 days into the 4 I have for wiring. I wasn't sure that I'd have time for everything so I prioritized. I've gotten the audio and my limited video distribution done. I'm almost done with cable/phone/internet. Then I was going to do security. After that comes ONQ.
After hours in a hot house, I'm officially brain dead and exhausted. Homerun a cat-5 to every switch and run a cat-5 between 3-ways? Don't I sometimes need 2 cat-5's to a location - like a 4 gang? Also I can use a branch point as another home run - probably the 2nd floor. Am I missing anything?
TIA
After hours in a hot house, I'm officially brain dead and exhausted. Homerun a cat-5 to every switch and run a cat-5 between 3-ways? Don't I sometimes need 2 cat-5's to a location - like a 4 gang? Also I can use a branch point as another home run - probably the 2nd floor. Am I missing anything?