Petepete_c said:Here there has been discussions relating to methodologies of EOL termination.
Specifically crimped or soldered; well and values of the resistors as it not universally the same values utilized.
IE: the Elk M1 versus the OmniPro II EOL stuff.
The above noted (it was a PITA to do) I soldered using a little portable solder device my EOLs then used heat shrink tubing on them.
mikefamig said:blueman2
The Data lines are connected in series as we described above but the 12vdc power on the data bus should originate at the M1 control for each device to minimize the length of the runs and hence the voltage drop.
Mike.
sda said:You do know about the Elk DBH (databus hub), right? While not actually needed, it can simplify things and makes less mess in the can.