shadowhunter
Member
First of all I must commend you super fast shipping, Bravo!!!
I just purchased one of your V3 1-wire wind devices. From reading your sensor wiring instructions it states that if I wire the cable according to your design I should remove the jumper from the board. ".....or a cable wired according to our wiring standard, you must remove the jumper from the Wind Instrument connector, or you will short out the circuit."
When I re-wired my lan I wired it according to your diagrams, so the weather station is set up with the four wires. I am not supplying any additional power to the network at this time so the additional wires are not connected to anything at the PC end of the network. I assume that until I supply additional voltage I shouldn'y have to remove the jumper.
Probably a stupid question, but thought I should ask before I risk damaging a new weather station.
Thanks,
Jim
I just purchased one of your V3 1-wire wind devices. From reading your sensor wiring instructions it states that if I wire the cable according to your design I should remove the jumper from the board. ".....or a cable wired according to our wiring standard, you must remove the jumper from the Wind Instrument connector, or you will short out the circuit."
When I re-wired my lan I wired it according to your diagrams, so the weather station is set up with the four wires. I am not supplying any additional power to the network at this time so the additional wires are not connected to anything at the PC end of the network. I assume that until I supply additional voltage I shouldn'y have to remove the jumper.
Probably a stupid question, but thought I should ask before I risk damaging a new weather station.
Thanks,
Jim